Storm Drain Group 828
San Diego · San Diego CIP
This city’s feed last changed on 2026-10-16. We check every morning.
| Status | Design |
|---|---|
| Stage | design |
| Start | Jun 2029 |
| Completion | Dec 2030 |
| City | San Diego |
| Source | San Diego CIP |
| Source ID | san_diego_cip:B16155 |
| Asset type | Drainage - Storm Drain Pipes |
| Community area | NORTH PARK |
| Contact | Public Information Line |
| Contact phone | 6195334207 |
| Council district(s) | 3 |
| Description | Several CMP storm drain pipes located within the right-of-way in this neighborhood need to be replaced because the condition of the pipes are poor. Many of these pipes are corroded and have extensive |
| Map pieces | 3 |
| Source last edited | 2023-02-27 |
This source does not publish a per-project page, so there is nothing to link to. The fields above are everything the city publishes.
What has changed
Nothing since we started tracking this project. We check every morning.