| Status | Design |
|---|---|
| Stage | design |
| Start | Oct 2031 |
| Completion | May 2033 |
| City | San Diego |
| Source | San Diego CIP |
| Source ID | san_diego_cip:B22072 |
| Asset type | Water - Distribution Sys - Distribution |
| Community area | OLD TOWN SAN DIEGO, MIDWAY-PACIFIC HIGHWAY |
| Contact | Public Information Line |
| Contact phone | 6195334207 |
| Council district(s) | 2 |
| Description | Construction of 3,856.37 linear feet LF (0.73 miles) of 8" and 12" water mains to replace existing asbestos cement (AC) water mains, installation of 4,967.59 LF (0.94 miles) of new PVC, and abandonmen |
| Map pieces | 9 |
| Source last edited | 2022-09-05 |
This source does not publish a per-project page, so there is nothing to link to. The fields above are everything the city publishes.